Sunday, December 6, 2015

Design Studio 3 - Porject 2A & 2B

Design Studio 3 - Porject 2A & 2B


In this project,it it will be combined with the Final project which is design a Visitor Imterpretive Centre in Sungai Lembing. Hence, we have a site visit in Sungai Lembing. In Sungai Lembing, our lecturers choose different topography of site in Sungai Lembing. I choose one of the site which is Tin Mining Area.

Project 2 A Site Analysis Video

In Project 2A, we have to make a video to introduce our site which is Sungai Lembing.
The content in the video show about the history of Sungai Lembing and three selected site that we are going to analysis.


Project 2B Concept Development

Site 2 - Tin Mining Area

We choose the site in order for our final project. We do research, interview and measurement at the site during 3 days trip to get know more about sungai lembing. We are also require to sketch some place or things that we feel poetic.

 Front view from the site.


Limitation of Site 2

Sustainable Bridge

In Project 2A, we are require to make a video about introducing Sungai Lembing.
In Project 2A, we have to focus on developing our concept in order to enhance our VIC form and the relationship between interior and exterior space.

Presentation Board of Development Concept

Poetic Sketches

Reflection: During Project 2A & 2B, I was given a chance to have site visit in Sungai Lembing. I can learn about the History and lifestyle of Sungai Lembing. On the other hand, design concept is very important. The progress of how to develop the concept and connecting it with architecture building have to be strongly planted so that it will not be too hard when I proceed to my final project.


0 comments:

Post a Comment